Bridge Lelystad
Civil
At the end of August, we renovated the bicycle bridge on the Woonhavenpad, which is under maintenance at Aannemersbedrijf Damsteegt.
Normally there is a lead cap on both poles, but one of the poles had it blown off the head. As a result, the head of the pile had started to rot due to rainfall. We drilled out the rotten wood, filled the hole with epoxy resin and fitted the pole with a new lead cap.
